This shot shows the first wall of the tunnel complete and the beginning of the top of the tunnel. We're using reclaimed wire racks direct from the dump/landfill (as well as washing machine lids) to help keep the cob in place for the roof of the tunnel, which will eventually be buried by the cob floor. We'll fill both sides of the tunnel with gravel to level the floor for the workshops later this summer. Blacki Black Black can already sense that this is going to be the coziest spot in the new house...he ain't moving!